An electrical bid-or-no-bid checklist scores each opportunity on six questions before anyone spends hours estimating: Are the documents complete? Does the schedule fit? Is the scope clear? Can we staff it? Can we buy it? Can we survive the payment terms? Estimating is not free, so the cheapest bid you will ever lose is the one you decline in fifteen minutes.
Price the cost of estimating first
Hypothetical numbers: a typical estimate takes 12 hours at an internal estimator cost of $75 per hour, so one estimate costs $900. If you win one bid in five, the expected estimating cost per win is $900 ÷ 0.20 = $4,500. Every job you win must contribute at least that much beyond direct costs, or your estimating department is subsidizing itself. That arithmetic is why a screen belongs ahead of the estimate.
The scorecard
Score each factor 0, 1 or 2 (0 = serious gap, 1 = workable with conditions, 2 = clear). The weights below are illustrative. Set your own based on what has hurt you before.
| Factor | Weight | What a “2” looks like |
|---|---|---|
| Documents | 20 | Current drawings and specifications are provided, addenda are tracked, and the owner names who answers questions. |
| Schedule | 15 | Start, milestones and completion dates are stated, and they fit your open crew weeks including permit and inspection lead time. |
| Scope clarity | 20 | Inclusions and exclusions are written, allowances are identified, and responsibility with other trades is defined. |
| Staffing | 15 | The right people exist and are free, including the qualified supervisor, without borrowing from current jobs. |
| Procurement | 10 | Long-lead items are known, supplier quotes can be held through award, and submittal review time is stated. |
| Payment exposure | 20 | Billing method, payment period and any held-back portion are known, and peak cash exposure fits your working capital. |
Points for a factor = weight × score ÷ 2. The total is out of 100.
Thresholds and knock-outs
- 70 or more: bid.
- 50 to 69: bid only if you can write the missing items into your proposal as conditions, exclusions or clarifications.
- Under 50: decline politely.
- Knock-out: a score of 0 on Staffing or Payment exposure means no bid, whatever the total.
The cutoffs are management choices. Adjust them after you compare the scores of past jobs with how they actually went.
Worked example (hypothetical)
A property owner invites you to bid a tenant improvement. You score it:
| Factor | Score | Points |
|---|---|---|
| Documents | 1 | 10 |
| Schedule | 2 | 15 |
| Scope clarity | 1 | 10 |
| Staffing | 2 | 15 |
| Procurement | 1 | 5 |
| Payment exposure | 1 | 10 |
| Total | 65 |
That falls in the conditional band. The 1s tell you what to fix. Ask for the missing sheets or confirm the scope in writing. State how long supplier pricing is held. Ask the billing and payment terms before pricing, because they decide whether the job is affordable. If the answers come back vague, the score stays at 65 and the decision becomes no-bid, which is a fair outcome.
Turn each “1” into a question
A score of 1 is only useful if it produces a written question. Keep a short list and send it before you start pricing:
- Documents: “Which drawing set and addenda should we price from, and who confirms we have the latest?”
- Scope: “Is work in these areas included, excluded or an allowance, and who covers the neighboring trades?”
- Procurement: “How long will pricing need to hold, and how long does your submittal review usually take?”
- Payment: “How often do you pay, after how many days, and is any portion held back?”
Record the answers with dates. The replies often move a 1 to a 2, or tell you that the person asking cannot answer, which is itself a scoring result. A question that goes unanswered counts as a 0 for that factor.
Check the supporting pieces
Payment exposure
Calculate peak exposure as monthly cost multiplied by months until the first payment arrives. If the job also needs a bond, the SBA’s surety bond page describes bid, payment and performance bonds and says that SBA-guaranteed bonds are available for some small businesses within stated contract-size limits and surety underwriting, so confirm what the customer requires and what your surety will support before you commit to a number. For the difference between cash and accrual views of a job, see the SBA’s finance guide.
Safety coordination
On sites with more than one contractor, ask who coordinates hazards and who controls access. The OSHA construction quick start notes that multi-employer jobsites fall under OSHA’s multi-employer citation policy, so this is a bidding question and not only a field question.
Make the decision visible
- Record every score, the final decision and who made it.
- For declined bids, send a short reply that thanks the sender and invites future bids, without describing your reasons in detail if they are sensitive.
- Every quarter, compare scores with results: win rate, margin and payment days by score band.
What this checklist cannot do
It does not value a relationship, a strategic customer or an unusual opportunity. It makes those exceptions deliberate. If you override a no-bid, write down why and what you will watch. It is also not a substitute for legal review of contracts, which a qualified professional should provide.
Sources
Primary pages read for this article, as checked November 12, 2026. Rules and figures change, so confirm current requirements with the relevant agency or professional.
- SBA: Surety Bonds: Bid, payment and performance bonds and SBA program limits.
- SBA: Manage Your Finances: Cash and accrual views of income relevant to payment exposure.
- OSHA Construction Industry Compliance Assistance Quick Start: Multi-employer jobsites and OSHA’s multi-employer citation policy.