Skip to content
Service Businesses

Price Electrical Jobs Using Loaded Labor Costs

Price electrical jobs from loaded cost per productive hour, not from the wage. A hypothetical calculation shows how paid hours, overhead and margin change the price.

Electrical estimator calculating job costs at office desk with closed cable sample box and blank timesheet forms

To price electrical jobs from loaded labor costs, work in four steps: (1) turn the hourly wage into a loaded cost per paid hour, (2) convert paid hours into productive, billable hours, (3) add overhead per productive hour, and (4) divide by one minus your target margin. The second step is easy to overlook. You pay for every scheduled hour, but you can only bill the hours that are actually spent on customer work.

Step 1: Loaded cost per paid hour

A wage is not your cost. The SBA’s guidance on hiring and managing employees notes that employers pay matching Social Security taxes and, depending on the state, may owe workers’ compensation, unemployment insurance and disability costs, and may offer benefits. Your payroll provider or accountant can tell you the actual add-on for your business. This article uses a placeholder percentage only to show the arithmetic. It does not address how workers should be classified, which is a legal and tax question for a qualified professional.

Hypothetical inputs: wage $38.00 per hour, add-ons of 28%.

  • Loaded cost per paid hour: $38.00 × 1.28 = $48.64
  • Annual cost at 2,080 paid hours: $48.64 × 2,080 = $101,171.20

Step 2: Paid hours versus productive hours

Paid time includes holidays, leave, training, shop time, loading the van, drive time you cannot bill, callbacks and slow days. Count what your own schedule data show. This example assumes 1,560 productive hours out of 2,080 paid hours (75%).

  • Loaded cost per productive hour: $101,171.20 ÷ 1,560 = $64.85

The gap between $48.64 and $64.85 is the cost of paid-but-not-billable time, and overlooking it can cause underpricing.

Step 3: Overhead per productive hour

Overhead covers items that do not belong to one job: insurance, vehicles, software, office labor, licensing fees, phone and marketing. The SBA’s finance guidance suggests categorizing expenses, for example as recurring or nonrecurring, which helps you decide what belongs in an annual overhead pool. Add the recurring items for a year and divide by the productive hours of all field staff.

Hypothetical: annual overhead of $180,000 and three field employees, each with 1,560 productive hours.

  • Total productive hours: 3 × 1,560 = 4,680
  • Overhead per productive hour: $180,000 ÷ 4,680 = $38.46
  • Full cost per productive hour: $64.85 + $38.46 = $103.31

Step 4: Price from margin, not markup

Markup is added to cost. Margin is measured against the selling price. If you want a 20% margin after overhead, divide by 0.80 instead of multiplying by 1.20.

  • Labor price per hour: $103.31 ÷ 0.80 = $129.14

Multiplying by 1.20 would give $123.97, which produces only a 16.7% margin ($20.66 profit ÷ $123.97).

Worked job estimate (hypothetical)

Line Calculation Amount
Labor 14 hours × $129.14 $1,807.96
Materials $620 cost × 1.15 handling allowance $713.00
Price $2,520.96

The 15% materials allowance is a placeholder for the cost of sourcing, carrying and returning materials. Set yours from your own purchasing records.

What the shortcut would have cost

Suppose the owner priced labor at the loaded paid wage plus 20%: $48.64 × 1.20 = $58.37 per hour.

  • Revenue for 14 hours at that rate: $817.18
  • Actual labor cost with overhead: 14 × $103.31 = $1,446.34
  • Labor shortfall: $1,446.34 − $817.18 = $629.16

The job would look busy and still lose money on labor.

Back-test the rate on a finished job

Before you trust the sheet, test it against work you already did. Take a recent job, add up the hours the crew really spent (including the unbilled trip back to the supplier) and compare cost with what you charged. Hypothetical: a job was sold for $2,100 and took 15 actual labor hours, with $620 of materials at cost.

  • Labor cost at the full rate: 15 × $103.31 = $1,549.65
  • Materials at cost: $620.00
  • Total cost: $2,169.65
  • Result: $2,100.00 − $2,169.65 = −$69.65

The job was invoiced as a win and lost money once overhead was counted. Run three or four jobs through this check. If most come out negative, the problem is in your prices or your hours, and the rate sheet has just found it for you.

Where this model breaks

  • Utilization guesses. If real productive hours are 65% of paid hours, not 75%, your cost per productive hour rises. Recalculate from timesheets every quarter.
  • Mixed crew levels. Apprentices and journey-level staff have different wages and different productivity. Build separate rates for each role rather than averaging them.
  • Overhead growth. Adding an office hire raises overhead before it raises billed hours. Recalculate before changing price.
  • Fixed-price jobs with unclear scope. Use a written scope, and price changes as change orders.
  • Competitive pressure. If the market price is below $129.14, the answer is to change the job mix, the productivity or the overhead, not to hide the loss.

A one-page rate sheet

Keep these figures on one page and review them every quarter:

  1. Wage and add-on percentage per role (from payroll).
  2. Paid hours, productive hours and utilization per role.
  3. Annual overhead and total productive hours.
  4. Target margin and resulting labor price per hour.
  5. Materials handling allowance.

Record the date of each input. A rate sheet that nobody dates is a guess in disguise. Have your accountant check the add-on percentage and overhead list before you rely on them.

Sources

Primary pages read for this article, as checked November 12, 2026. Rules and figures change, so confirm current requirements with the relevant agency or professional.